PRODUCT OWNER
Eau de Paris
CONSTRUCTOR
Eau de Paris
COMPANY(IES)
Bonna TP
CONSTRUCTION DATE
2017
LOCATION
rue de Crimée et rue Botzaris (Paris 19ème)
The work consisted of removing 850 metres of DN300 non-drinking water conduit and replacing it with a new DN150 one, removing 400 metres of DN100 drinking-water conduit and replacing it with a new DN150 one and removing 480 metres of DN100 non-drinking water conduit. Part of the old conduits (300 metres) was contaminated with asbestos. The old conduits were removed once an asbestos removal plan had been approved.
The old grey cast-iron pipes were replaced with new cast-iron conduits.
Access to the work areas was provided by four work shafts.
This work was carried out in the sewer under rue de Crimée and rue Botzaris in the 19th district of Paris.